All the aft deck hardware is now in.  The stern rail is on.  A custom made, extra long railing that extends further forward than most boats.  The cleats, deck wash, hot/cold shower control and shower head, mizzen boom shackles,and running back stay shackles.

Going as fast as we can.  Did a million little jobs this weekend.  Weather has finaly been good.

Put in a new diesel fill port. (Old one leaked INTO the hole, not good).
Installed Frigoboat controls
Installed wood around starboard fuel tanks (work bench).
Ran some more wires.
Fixed some pipes.
Got sunburned.