Bow roller is installed.  Well.....except for a few bolts that I had to special order.  But it is caulked and bolted down.
Chain plate is also on.  The chalk on the right had to be moved.  The bolts broke and were galvanized in.  So we drilled and tapped new holes.  If you look carefully, it is 1/2 inch more forward than the one on the left.
 

Continue reading ...