All the aft deck hardware is now in. The stern rail is on. A custom made, extra long railing that extends further forward than most boats. The cleats, deck wash, hot/cold shower control and shower head, mizzen boom shackles,and running back stay shackles.
Going as fast as we can. Did a million little jobs this weekend. Weather has finaly been good.
Put in a new diesel fill port. (Old one leaked INTO the hole, not good).
Installed Frigoboat controlsInstalled wood around starboard fuel tanks (work bench).Ran some more wires.Fixed some pipes.Got sunburned.