It took another 2 weeks of little stuff, a new fuel pump (other was not yet replaced), a strange fuel filter gasket issue, some leaks in a water tank to fix, and 100 little things, of which are done, but another 200 are now found.  

But we made it and we are off sailing.
First trip was a 50 mile trip up the Chesapeake bay to fix the Freezer.  Apparently our Frigoboat freezer, which I have read lots of good things about, has a clog.  So they are fixing it tomorrow,....I hope.  But the extra insu...
Continue reading ...